4th Phase of “Doodeh Sanati Pars”

The 4th phase of development plan includes a new production line with 20000 TPY Hard reactor and the downstream consist of Filtration system Granulation system Rotary Dryer and Silos with a capacity of 40000 TPY. After the implementation of the 4th phase of development plan and integration with phase 3 three independent production line of hard grade with 40000 TPY capacity (2 Jumbo reactors) and 15000 TPY (old line) will be in service. The total nominal capacity will reach 70000 TPY.

FS & PFS 6,500
Basic Engineering & Detailed Engineering 335,000
Civil Works 352,500
Procurement 5,063,000
Construction 1,260,000
MC 500,000
Pre-commissioning, Commissioning, Other Costs 100,000

Dudeh Sanati Pars Co. (DSP Co.) has started its production activity in 1994 in Central Province, Saveh City, Kaveh Industrial Estate. The initial capacity of this company was over 15,000 TPY (Tons Per Year) of different grades of carbon black (Hard grades & Soft grades). In 2006, the Second Phase of the factory with a capacity of 15,000 TPY was put into operation. Two independent trains with 30,000 TPY total capacity.
In 2023 the Third Phase of the development plan “Renovation & Replacement of Reaction Section of the Hard Carbon Black Production Line” was put into operation and increased the Hard Grades capacity (from 15,000) to 20,000 TPY with an investment of 5.3 million Euros.

The Hard reactor development plan in phase 3 (green color in bellow picture) was designed with all Iranian technical know-how and was successfully implemented in less than 2 years. Due to this successful experience, the company started long-term planning for the development of the factory, based on the localization of technical know-how and increasing the production capacity up to 115,000 TPY by implementing phase 4 (Pink
color), phase 5 (blue color) and phase 6 (Purple color).

Request Project documents and details
Country

Islamic Republic of Iran

Estimated investment costs

10 to 100 million

Local entrepreneur or party

Private sector

Project classification

Expansion or rehabilitation

Region

Tehran