Bandar Abbas Refinery Base Oils Group II and III Production Complex Project

This project includes revamping of one exist unit and construction of 3 new process units as mentioned below:

• Revamping of existing Hydrocracker Unit (HCU)
• Construction of UCO Iso-dewaxing Unit (UIDW)
• Base Oil Blending and Packaging Unit (LOB)

required feed for the UIDW Unit of this project is supplied from exist Hydrocracker Unit of Bandar Abbas oil refinery.

– Value of foreign equipment / machinery 65 Million €
– Value of local equipment / machinery 97.5 Million €
– Value of foreign technical know-how 5 Million €
– Value of local technical know-how 7.5 Million €
– Net present value (NPV) at 10.1%: 1435 Million €
– Internal Rate of Return (IRR): 45.4
– Payback Period: 5.1 years
– Dynamic Payback: 5.5 years

 

Request Project documents and details
Country

Islamic Republic of Iran

Estimated investment costs

100 to 1000 million

Local entrepreneur or party

Public sector

Project classification

Expansion or rehabilitation

Region

Hormozgan